Contact us
086-18506839898
Chuangjiuman Transmission System (Hangzhou) Co., Ltd
Tel : 086-0571-86161808
Fax : 086-0571-86161758
Contact : Mr. Shi
E-mail : zhilishi@hzcjm.com
Add : No. 76, Xingqiao North Road, Xingqiao Subdistrict, Linping District, Hangzhou City
Web : http://www.hzcjm.com
Operation steps for ABB frequency converter inspection and maintenance
Date:2021-05-27 16:30:14
1. Conduct a visual inspection of the radiator of the ABB variable frequency motor to ensure that it is clean and tidy.
2. Inspect the appearance of the ABB variable frequency motor cooling fan to ensure proper installation and check that the cooling fan is operating normally.
3. Check if the power semiconductor module is fixed, based on the standard of rectifier tube 0.5/2,3Nm (raw/final) and IGBT module 0.5/3,5Nm (raw/final).
4. Check the wiring of the ABB variable frequency motor circuit board and main power circuit. During the appearance inspection of the ABB variable frequency motor, all electrical circuits must be given high attention to ensure that they are fixed and not moved. Check whether all installation screws are tightened; Check the wiring of DC capacitors and DC series reactors; Check the wiring of the sensor of the frequency converter; Check the connection wires inside the circuit board; Check the welding status of the output power module.